Library Periodical Storage

Search
Exact matches only
Search in title
Search in content
Search in comments
Search in excerpt
Filter by Custom Post Type

Periodical Storage for Central York School Library

Central York School District


Installation Type High School
Download this Solution Download
Product Installed

Problem
When the Central York School District was constructing their new high school, the administrators wanted to both conserve and maximize space in the new building. The administrators were especially concerned because the new library only had a limited area for the school’s current collection of reference materials, with little space to accommodate future growth. To address their space planning needs, they contacted Datum.

Solution
After reviewing the library floor plan and assessing their storage accessibility requirements, Datum assisted the school administration in selecting a MobileTrak5 System with 4Post Shelving. The new system allowed the library to store all their materials in less floor space than was originally anticipated. The space savings also created room for additional student workstations in the reference area of the library. Additionally, the administration was able to choose paint and laminate options to match the decor of the new library.

Please Note: some profiles of success may contain order versions of products, please check product pages for current specs.

Experiencing Similar Storage Problems?

Contact a Datum representative to discuss your storage needs today!

Contact Datum