Blueprint Storage

Search
Exact matches only
Search in title
Search in content
Search in comments
Search in excerpt
Filter by Custom Post Type

Blueprint Storage for Re-Steel

Re-Steel


Installation Type Office
Download this Solution Download
Product Installed

Problem
Hard copy blueprints are a must at any construction site. That is why Re-Steel, makers of the steel bars used to reinforce concrete known as rebar, found it necessary to have a more space efficient and easier to use storage system for their archived rolled blueprints. Datum had their answer.

Solution
Re-Steel’s previous system consisted of laminated cubby holes stacked on top of each other, which didn’t hold nearly the capacity that they needed. To solve this issue, Datum recommended two MobileTrak5 Systems, equipped with 4Post Shelving.

The 4Post was customized to create eight cubes for each of the four sections of the MobileTrak5. Each cube could hold a large number of rolled plans, and these cubes could be labeled by month and year to help organize their archival system. Each section of the MobileTrak5 was fitted with sectional back panels to keep the rolled plans from being pushed out of the back of the unit.

This new system tripled their former capacity and allowed for a neater, more organized archiving system.

Please Note: some profiles of success may contain order versions of products, please check product pages for current specs.

Experiencing Similar Storage Problems?

Contact a Datum representative to discuss your storage needs today!

Contact Datum